Published

Brixton Metals Drills 8.00m of 11.37 g/t Gold including 2.00m of 44.43 g/t Gold all within 82.00m of 1.27 g/t Gold at its Trapper Target on the Thorn Project – Brixton Metals

Summary by Globe Newswire
VANCOUVER, British Columbia, Oct. 16, 2024 (GLOBE NEWSWIRE) — Brixton Metals Corporation (TSX-V: BBB, OTCQB: BBBXF) (the “Company” or “Brixton”) is pleased to announce additional 2024 drill results from the Trapper Gold Target at its wholly owned Thorn Project. The project is located in Northwest British Columbia, 90km east of Juneau, Alaska. Highlights Hole THN24-304 yielded 227.50m of 0.50 g/t Au from 40.00m depth Including 82.00m of 1.27 g/t
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

Sources are mostly out of (0)

Similar News Topics

You have read out of your 5 free daily articles.

Join us as a member to unlock exclusive access to diverse content.