Final transformer placed at Melbourne Renewable Energy Hub
1 Articles
1 Articles
Final transformer placed at Melbourne Renewable Energy Hub
SEC Victoria has announced the arrival of the third and final transformer at Melbourne Renewable Energy Hub (MREH) for the 600MW Battery Energy Storage System (BESS). Related article: Grid works underway for Melbourne Renewable Energy Hub Weighing a massive 335 tonnes, the transformer travelled from the Port of Melbourne to the Melbourne Renewable Energy Hub in Plumpton with an oversized load escort in the early hours of the morning to avoid tra…
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
To view factuality data please Upgrade to Premium
Ownership
To view ownership data please Upgrade to Vantage