See every side of every news story
Published loading...Updated

General Dynamics Electric Boat awarded $1 billion contract modification for long lead time material for Virginia-class submarines

  • General Dynamics Electric Boat has received a $1 billion contract modification to buy materials for Virginia Class Block VI submarines, as announced by the U.S. Department of Defense.
  • The contract supports the submarine industrial base's production capacity and funding needs, according to Mark Rayha, president of General Dynamics Electric Boat.
  • General Dynamics Electric Boat is the lead contractor and collaborates with HII's Newport News Shipbuilding in Virginia for submarine construction.
  • The Virginia-class submarines accommodate various 21st-century mission requirements, including anti-submarine warfare and special operations support.
Insights by Ground AI
Does this summary seem wrong?

50 Articles

All
Left
1
Center
15
Right
6
hartfordcitynewstimes.comhartfordcitynewstimes.com
+40 Reposted by 40 other sources
Center

General Dynamics Electric Boat awarded $1 billion contract modification for long lead time material for Virginia-class submarines

GROTON, Conn., March 25, 2025 /PRNewswire/ -- General Dynamics Electric Boat, a business unit of General Dynamics (NYSE: GD), announced today it has been awarded a $1 billion undefinitized contract modification allowing Electric Boat to purchase long lead time materials…

·Hartford City, United States
Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 68% of the sources are Center
68% Center
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

19FortyFive broke the news in on Tuesday, March 25, 2025.
Sources are mostly out of (0)

You have read out of your 5 free daily articles.

Join us as a member to unlock exclusive access to diverse content.