See every side of every news story
Published loading...Updated

Holt Route B bridge over Hickory Creek replacement scheduled to begin May 5 | Missouri Department of Transportation

Summary by modot.org
Holt Route B bridge over Hickory Creek replacement scheduled to begin May 5 Visitor (not verified) Wed, 04/23/2025 - 16:10 ST. JOSEPH, Mo. – The Missouri Department of Transportation has contracted North Central Bridge, LLC to replace the Hickory Creek Bridge on Holt County Route B. The project, which will replace the current bridge that was built in 1938, is scheduled to begin Monday, May 5. Traffic Impacts: During construction, Route B will be…
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

3 Articles

All
Left
Center
Right
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

modot.org broke the news in on Wednesday, April 23, 2025.
Sources are mostly out of (0)

Similar News Topics

You have read out of your 5 free daily articles.

Join us as a member to unlock exclusive access to diverse content.