SA wind farm celebrates 20th birthday - Utility Magazine
3 Articles
3 Articles
SA wind farm celebrates 20th birthday - Utility Magazine
Image: VestasIn a milestone for South Australia’s renewable sector, Canunda Wind Farm has celebrated its 20th birthday with a ten-year extension to its operations. Commissioned in 2005, it is one of the state’s oldest wind farms, with the ENGIE wind farm initially expected to have an operational life of 20 years. However, a recent life extension assessment completed between ENGIE and turbine manufacturer Vestas has determined that the project’…
Milestone anniversary for Canunda Wind Farm - Ecogeneration
Image: ENGIEThe Canunda Wind Farm in South Australia has reached its 20-year milestone, with ENGIE and turbine manufacturer Vestas announcing a 10-year extension to the project’s operational life. Located near Millicent and Mount Gambier, the 46 megawatts wind farm was commissioned in 2005 and has since contributed to South Australia’s renewable energy mix. A life extension assessment conducted by ENGIE and Vestas determined that the wind farm c…
Milestones for Canunda Wind Farm - Energy Magazine
Image: VestasOne of South Australia’s oldest wind farms has celebrated its 20th birthday and a ten year extension to its operations. Commissioned in 2005, ENGIE’s Canunda Wind Farm was initially expected […] The post Milestones for Canunda Wind Farm appeared first on Energy Magazine.
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
To view factuality data please Upgrade to Premium
Ownership
To view ownership data please Upgrade to Vantage