Get access to our best features
Get access to our best features
Published

New Pittsburgh airport terminal at 80% completion: Take a look inside

Summary by WTAE
The signature tunnel taking passengers from landside to airside will mimic the drive through the Fort Pitt Tunnel onto the Fort Pitt Bridge, with electronic imagery to enhance the experience.
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 100% of the sources are Center
100% Center
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

Sources are mostly out of (0)

Similar News Topics