See every side of every news story
Published loading...Updated

One by one across the Ölfusár Bridge

Summary by RÚV
Construction of the road construction and design of the new Ölfusár Bridge is in full swing, and the bridge is scheduled to be put into service in 2028. The total cost of the bridge and the road construction around it is about 18 billion, and the toll is to cover that cost. The new bridge will be 330 meters long and built above Selfoss. All heavy transport will be directed over the new bridge. The road construction agency has placed a sign at th…
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

RÚV broke the news in on Saturday, March 29, 2025.
Sources are mostly out of (0)

You have read out of your 5 free daily articles.

Join us as a member to unlock exclusive access to diverse content.