Sellafield Construction of new “Box Encapsulation Plant” Requires Dumping Nearly 1 Million Litres of Contaminated Water into the River Calder Every Day For An Unknown Length of Time
1 Articles
1 Articles
Sellafield Construction of new “Box Encapsulation Plant” Requires Dumping Nearly 1 Million Litres of Contaminated Water into the River Calder Every Day For An Unknown Length of Time
And they already use the River Calder as a sewer for radioactive crapola, there is sacrifice and then there is sacrifice. Marianne Birkby, Apr 21, 2025, Radiation Free Lakeland If anyone can make sense of this document received from the Environment Agency then please do get in touch – the deadline for comments to the EA is 23rd April. From what I can see the plan is to dig a tunnel and drive multiple piles into the alluvium sandstone below Sella…
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
To view factuality data please Upgrade to Premium
Ownership
To view ownership data please Upgrade to Vantage