STLLR Gold uses A.I. assisted infill drilling, intersects 2.22 g/t gold over 33.0 metres at Tower Gold Project, Ontario – Resource World Magazine
1 Articles
1 Articles
STLLR Gold uses A.I. assisted infill drilling, intersects 2.22 g/t gold over 33.0 metres at Tower Gold Project, Ontario – Resource World Magazine
STLLR Gold Inc. [TSX: STLR; OTCQX: STLRF; FSE: O9D] reported additional infill drilling results using artificial intelligence technology (AI) at the Tower Gold Project in the Timmins Mining Camp, northern Ontario, Canada. Tower Infill Drilling Highlights – 903 Deposit: Drill hole MGA25-227 returned 2.22 g/t gold (uncut) over 33.0 metres, including 2.57 g/t gold over 25.40 metres. Hole MGA25-233 returned 2.95 g/t gold over 7.0 metres. Keyvan Saleh
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
To view factuality data please Upgrade to Premium
Ownership
To view ownership data please Upgrade to Vantage