See every side of every news story
Published loading...Updated

UBC Okanagan construction site to reach records with concrete pour

  • Crews will pour concrete for the UBC Okanagan downtown campus tower foundation on April 28 in Kelowna.
  • Tower construction previously caused ground shifting in November 2023, leading to building evacuations.
  • The project reduces the tower height from 46 to 43 storeys.
  • The pour requires 70 trucks and an estimated 5,600 cubic metres of concrete starting at 1 a.m.
  • This pour will be the largest outside the Lower Mainland and UBC faces lawsuits from the controversy.
Insights by Ground AI
Does this summary seem wrong?

11 Articles

All
Left
10
Center
Right
West K NewsWest K News
+10 Reposted by 10 other sources
Lean Left

UBC Okanagan construction site to reach records with concrete pour

The pour is estimated to take 22 hours

·Kelowna, Canada
Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 100% of the sources lean Left
100% Left
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

West K News broke the news in Kelowna, Canada on Thursday, April 24, 2025.
Sources are mostly out of (0)

Similar News Topics

You have read out of your 5 free daily articles.

Join us as a member to unlock exclusive access to diverse content.