See every side of every news story
Published loading...Updated

U.S. 231 project still on track for summer completion  - The Troy Messenger

Summary by The Troy Messenger
The Alabama Department of Transportation (ALDOT) began its access management project on U.S.-231 in Troy back in December 2024, and the project is on track for a summer completion. Southbound between Lakeside Drive and Elba Highway will have a bulb and there will be one southbound at Lakeside Drive. The project is ongoing along U.S.-231 from Elba Highway to Industrial Park Boulevard and will see the limitation of some turning movements by instal…

Bias Distribution

  • 100% of the sources lean Right
100% Right
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

The Troy Messenger broke the news in on Tuesday, April 8, 2025.
Sources are mostly out of (0)

You have read out of your 5 free daily articles.

Join us as a member to unlock exclusive access to diverse content.